• Mon - Fri: 8:00 - 5:00
  • 941-907-9099
  • info@halfacreco.com

Tri-Eagle Distributing

PROJECT DESCRIPTION

Project Type: New Construction / Pre-engineered Metal Building / Tilt Wall
Location: Tallahassee, FL
Budget: $8,404,000
Size: 120,000
Project Features:


  • Freezer and cooler cold storage space

  • Drive-through loading

  • Brick veneer

  • Class “A” finishes

  • Bamboo flooring